Sl.No |
SMI/ Instruction No. |
Revision No. |
Subject |
Effective date |
|
1 |
0 |
Instruction for booster TFP & return conductors |
27.05.1994 |
|
|
2 |
0 |
Design of fixed shunt capacitor banks |
Jan-1997 |
|
|
3 |
0 |
Action to be taken in case of failure of an insulator |
17.09.2001 |
|
|
4 |
0 |
Use of copper cross feeder at switching station |
20.09.2001 |
|
|
5 |
0 |
Splicing of 19 by 3.99 mm Aluminium conductor |
01.10.2001 |
|
|
6 |
0 |
Operating procedures of TSS in Mumbai area |
15.12.2005 |
|
|
7 |
0 |
Insulators to be retained in service |
13.12.2005 |
|
|
8 |
1 |
Handling of Composite insulators |
20.04.2023 |
|
|
9 |
0 |
DRPC in Indian Railway |
03.04.2007 |
|
|
10 |
0 |
Application of lubricants on wire rope used with ATD |
01.02.2010 |
|
|
11 |
0 |
Parallel operation of traction transformers on IR |
01.06.2008 |
|
|
12 |
0 |
Protection scheme with parallel operation of 2x21.6 MVA transformers |
July -2008 |
|
|
13 |
0 |
Application of panto flash over relay at TSS for single line section on IR |
23.01.2009 |
|
|
14 |
0 |
Harmonics measurement and recording in a 25 KV TSS |
29.09.2009 |
|
|
15 |
0 |
Timely replacement & upgradation of computers at RCCs of traction SCADA |
Dec-2009 |
|
|
16 |
0 |
Increasing data transformer speed of traction SCADA system |
01.01.2010 |
|
|
17 |
- |
Guidelines for protection relays |
02/2010 |
|
|
18 |
- |
Instruction for operating RTUs with power supply of 110 V DC for SCADA system |
02/2010 |
|
|
19 |
- |
Monitoring & analysis of feeder CB tripping for 25 KV AC traction system |
06/2010 |
|
|
20 |
- |
Improving reliability of traction SCADA system |
08/2010 |
|
|
21 |
- |
Relay setting guidelines for 25 KV AC fitted with 30 MVA traction transformer |
09/2010 |
|
|
22 |
- |
Maintenance practice of numerical relays |
10/2010 |
|
|
23 |
- |
Feeder protection modules |
10/2010 |
|
|
24 |
- |
Relay settings of Delta I Relay |
04/2011 |
|
|
25 |
- |
42 KV Metal oxide gapless LA on IR |
05/2011 |
|
|
26 |
- |
Setting Up earthing station at SP & SSP |
04/2013 |
|
|
27 |
2 |
Earthing station at SP & SSP w.e.f. 19.02.2020 |
19.02.20 |
|
|
28 |
- |
Foundation report |
09/2017 |
|
|
29 |
- |
ODC movement in Electrified area |
01/2019 |
|
|
30 |
- |
Earthing of various bridges |
02/2019 |
|
|
31 |
- |
Making non schedule hole in steel structure |
01/2019 |
|
|
32 |
0 |
Nov 2020 Cleaning of 25 KV composite insulators |
11/2020 |
|
|
33 |
- |
Guidelines for rigid catenary for tunnels & sidings |
09/2020 |
|
|
34 |
- |
OHE Guidelines for increasing speed to 160 KMPH on NDLS-HWH & NDLS-BCT Routes |
10/2020 |
|
|
35 |
1 |
PSI Guidelines for increasing speed to 160 KMPH on NDLS-HWH & NDLS-BCT Routes |
02/2022 |
|
|
36 |
0 |
Cross acceptance criteria for new Items designs Specifications |
18.02.2022 |
|
|
37 |
0 |
Guidelines for hot line cleaning of insulators with covering letter |
01/2023 |
|
|
38 |
- |
OHE design in concourse area for station development projects. |
06/2023 |

Accessibility Controls