Sl |
SMI/Instruction No. |
Revision No. |
Subject |
Effective date |
|
1 |
0 |
Failure of 25 KV pedestal insulator |
23.10.1982 |
|
|
2 |
0 |
Use of disc insulator |
04.06.1984 |
|
|
3 |
0 |
Failure of 9-T insulator |
14.09.1984 |
|
|
4 |
1 |
Testing of solid core insulators |
25.05.2001 |
|
|
5 |
3 |
Winch type ATD |
01.04.2006 |
|
|
6 |
2 |
Guidelines for capacitor banks |
10.07.2003 |
|
|
7 |
0 |
Development of 107 sq mm silver bearing CU contact wire |
03.03.1998 |
|
|
8 |
2 |
OHE on turnout & crossover to avoid panto entanglement |
28.09.2001 |
|
|
9 |
3 |
3 pulley type ATD |
01.04.2006 |
|
|
10 |
0 |
Contact wire in out of run OHE |
01.06.1999 |
|
|
11 |
1 |
Provision of pipe on hex tie rod of ATD |
28.09.2001 |
|
|
12 |
0 |
Provision of insulated catenary under over line structures |
08.09.1999 |
|
|
13 |
2 |
OHE Contact wire & associated fittings |
21.10.2002 |
|
|
14 |
2 |
Inspection & test schedule for traction transformer |
05.05.2006 |
|
|
15 |
1 |
Schedule for POH of traction transformer |
01.10.2003 |
|
|
16 |
2 |
Overhauling of traction transformer |
22.09.2017 |
|
|
17 |
0 |
Measurement of severity of pollution by brush wash method |
05.04.2005 |
|
|
18 |
1 |
Condition monitoring of LAs provided on traction systems on IR |
08.04.2010 |
|
|
19 |
1 |
Testing of insulators |
20.04.2023 |
|
|
20 |
2 |
SMI for 8 wheeler tower wagon covering DETC & DHTC |
28.11.2017 |
|
|
21 |
0 |
Guidelines for uniflow overhead loading of rakes in electrified sidings |
28.01.2009 |
|
|
22 |
1 |
Guidelines for uniflow overhead loading of rakes in electrified sidings |
09/2017 |
|
|
23 |
0 |
Gas ATD |
01.11.2009 |
|
|
24 |
- |
Precautions for splicing insulated cadmium cupper catenary |
26.09.2012 |
|
|
25 |
- |
Provision of disconnector assembly to the LAs |
08.08.2013 |
|
|
26 |
2 |
Provision of Disconnector assembly |
20.03.2023 |
|
|
27 |
1 |
Tolerance and limits in OHE with 65/107 sqmm catenary/ contact wire with 1000 Kg tension |
- |
|
|
28 |
1 |
Prevention of bird menace |
27.09.2021 |
|
|
29 |
0 |
Installation of ending clamps |
08.12.2017 |
|
|
30 |
0 |
Maintenance of 4-Wh tower wagon |
27.06.2017 |
|
|
31 |
- |
Pre and Post Monsoon Precautions for Traction Installation |
05.10.2017 |
|
|
32 |
- |
Maintenance of Vacuum CB & BM |
08.09.2017 |
|
|
33 |
- |
Identification of defects by using Thermo vision camera |
26.10.2017 |
|
|
34 |
2 |
Prevention of monkey menace Nov 20 |
18.11.2020 |
|
|
35 |
- |
Flaw in contact wire |
2021 |
|
|
36 |
- |
Prevention of parting at RRA clamp Feb 2019 |
Feb-2019 |
|
|
37 |
1 |
Prevention of parting of contact wire at RRA clamp |
10.08.2021 |
|
|
38 |
- |
Prevention of bird faults & melting of catenary under suspension clamp |
Jan-2020 |
|
|
39 |
- |
Traction Distribution equipment for 160 KMPH train operation |
01.12.2022 |