Sl No | Dept Name | Notice No | Name of Work | Letter of Acceptance |
01 | SANDT | 09/2015/VSKP/S&T, Date : 23-07-2015 | Comprehensive Annual Maintenance Contract for 533 Nos. of PCs and 417 Nos. of Printers over Waltair Division of East Coast Railway for a period of 24 ( Twenty four ) months/2 ( Two ) years. | Letter of Acceptance |
02 | SANDT | AMC:QN:ECR:VSKP:066(13-14), Date: 24-02-2014. | AMC for the IPS Systems of Statcon make installed at 66 stations of waltair Division of E.Co.Rly, for a period of Three(3) years. | Letter of Acceptance |
03 | SANDT | Budget: e2E/2014-15/197, Date: 19-03-2014. E2E/2014-15/197-N1, Date: 25-08-2014.
| AMC for the EI System of GE make installed at 3 stations viz. Darliput(DPC), Padua(PFU) and Bheja(BHJA) of WAT division for a period of 3 (Three) years. | Letter of Acceptance |
04 | SANDT | e2E/2015-16/073, Date: 09-07-2015. | AMC for the EI System of GE make installed at 2 stations viz. Boddavara (BDVR) & Jagadalpur(JDB) of WAT division for a period of 3 (Three) years. | Letter of Acceptance |
05 | SANDT | S&T/Tender/2016/AMC/HBL/IPS, Date: 15-07-2016. | Comprehensive Annual Maintenance Contract for 10 nos. of HBL make mini IPS of WAT division for a period of 03 (Three) years. | Letter of Acceptance |
06 | SANDT | SANDT_AMC_IPS_AMARA RAJA, Date: 02-12-2016. | The Comprehensive Annual maintenance Contract for 20 nos. of Amara Raja make IPS (Integrated power supply) System of waltair Division for period of 03 (Three) years which is a SMPS based power supply of different signaling equipments like relays, Block Instruments, Axle Counters, Operation of point and other control Circuits etc, as applicable. | Letter of Acceptance |
07 | SANDT | AMC_PRS_UTS, Date: 09-08-2016. | Comprehensive Annual maintenance of all system peripheral Equipments of the Passenger Reservation System (PRS) & Unreserved Ticketing System(UTS) at all stations/locations of Main Line, R.V.Line, K.K.Line & K.R.Line (Total 83 stations of UTS locations and 27 PRS locations) of Waltair Divn. The equipments include (a) Dumb Terminals along with keyboard.(b) Thin Client along with Terminal & Key Board (c) Report Printers (d) Terminal Servers (e) Ticket Printers (f) Chart Printers for 03 (Three) Years. | Letter of Acceptance |
08 | SANDT | SANDT_2017_CAMC_EI_MEDHA, Date:05-07-2017. | Comprehensive Annual Maintenance Contract for Electronic Interlocking System of MEDHA make at 5 Stations (DIR,PBV,MKRD,JDB,KMEZ) of Wat Divn for 03 (Three) years. | Letter of Acceptance |
09 | SANDT | EFF/15-16/CUS/OUT/DEC/81, Date:22-03-2016. | Comprehensive Annual Maintenance Contract for Dataloggers of Waltair Divn. (113 No.s) for a period of 03 (Three) years. | Letter of Acceptance |
10 | SANDT | SRAP/ECoR/AMC-3 Stns/01796, Date:27-03-2014, SRAPL/ECoR/AMC-3 Stns/01889; Date:04-06-2014 | AMC for WESTRACE-VML-6 based EI Systems installed at 3 (Three)(KMX, DNV and SNM) Rly. Stations of Wat Division for a period of 3(Three) Years. | Letter of Acceptance |
11 | SANDT | S&T/Tender/2015/AMC/EI-Ansaldo, Date: 09-04-2015. | AMC for the Electronic Interlocking Systems manufactured by Ansaldo STS Transportation System India Pvt.Ltd. of 17 stations in WAT division for a period of 3(Three) Years. | Letter of Acceptance |
12 | SANDT | 16/2011/VSKP/S&T, Date:05-09-2011. | Provision of Electronic Coach Indication Boards at Koraput of Waltair Division(Supply, Installation, Testing, Commissioning & Annual Maintenance). | Letter of Acceptance |
13 | Commercial | WCX/MEM/Outsourcing/Comm.Activities/2015, Date: 23-11-2015 | Outsourcing of Auto Announcements system, face to face enquiry facilities & Operation of computerized CIBs, TIBs at VSKP, VZM, CHE, RGDA, DVD, KRPU, VBL & PVP Stations for a period of one year. | Letter of Acceptance |
14 | Electrical (TRS) | WAT/TRS/Tender/2015-16/Shed cleaning, Date:24-09-2015. | Cleaning works for Electric Loco Shed premises, Visakhapatnam for a period of Two(2) Years. | Letter of Acceptance |
15 | Electrical (TRS) | WAT-TRS-OT-16-17-Welding, | Welding works of electric locos at ELS/VSKP for a period of 2 years. | Letter of Acceptance |
16 | Mechanical (Diesel) | MEG:ECOR:VSKP:5052/16, Date:23.07.2016 | Overhauling for actuator unit of Micro Controlled Based Governor of Medha make in Sch M-48 & M-96 fitted in Diesel Electrical Locomotives. | Letter of Acceptance |
17 | Mechanical | WMT/16/C-Category & Panel Patching/VSKP, Dated: 01.03.2016. | Repair of C-Category unloadable BOXN wagons at CSL Depot and Panel Patching Repairs at CSL, OEC and VSPS depots of VSKP Division for a period of 2(Two) years. | Letter of Acceptance |
18 | Mechanical | eT-SrDME-WAT-15-2017. | Outsourcing of coal lifting and housekeeping activities at Central Sick line depot (CSL depot) of VSKP Division for a period of 02 years. | Letter of Acceptance |
19 | Mechanical | eT-SrDME-WAT-21-2017. | Mechanized Cleaning and watering of coaches under CTS during halt at Rayagada station including platform returned trains for a period of 02 years. | Letter of Acceptance |
20 | Mechanical | WMT/16/CTS/VSKP, Dated: 25.04.2016. | Mechanized Cleaning and watering of coaches under CTS during halt at Visakhapatnam station including platform returned trains for a period of 02 years. | Letter of Acceptance |
21 | Mechanical | eT-SrDME-WAT-14-2017, Date:07.04.2017 | Housekeeping and Allied activities at OEC wagon depot (Ore Exchange Complex) of Visakhapatnam Division for a period of 2 (two) years. | Letter of Acceptance |
22 | Mechanical | eT-SrDME-WAT-19-2017, Date: 11-07-2017 | Housekeeping and Allied activities at VSPS depot (Visakhapatnam Steel Plant siding) of Visakhapatnam Division for a period of 2 ( Two ) Years | Letter of Acceptance |
23 | Mechanical | eT-SrDME-WAT-22-2017. Date: 09.08.2017 | Housekeeping of Visakhapatnam coaching depot premises of Visakhapatnam Division for a period of 02 years. | Letter of Acceptance |
24 | Mechanical | WMT/15/mcc/vskp, Dt: 15.07.2015 | Mechanized cleaning of coaches for primary trains(Group-A) at Visakhapatnam coaching depot for a period of 02(Two) years. | Letter of Acceptance |
25 | Mechanical | WMT/15/MCC/VSKP, Date: 15.07.2015. | Mechanized Cleaning of coaches for Primary Trains(Group-B) at Visakhapatnam coaching depot for a period of 02(Two) years. | Letter of Acceptance |
26 | Mechanical | eT-SrDME-WAT-12-2016, Date: 03.03.2017 | Provision of Onboard Housekeeping Services for Visakhapatnam based Primary Trains (Phase-II) for a period of 20 months. | Letter of Acceptance |
27 | Mechanical | WMT/16/OBHS/Phase-III/VSKP, Date: 10.03.2016 | Provision of Onboard Housekeeping Services for Visakhapatnam based Primary Trains(Phase-III) for a period of 03 years. | Letter of Acceptance |
28 | Mechanical | eT-SrDME-WAT-10-2016, Date: 27.01.2017 | Provision of Onboard Housekeeping Services for Visakhapatnam based Primary Trains(Phase-I) for a period of 01(One) year. | Letter of Acceptance |
27 | Mechanical | WMT/16/Running Room/DMNJ , Date: 08.02.2016 | Maintenance and providing service for 16 bedded running room at Damanjodi and loading/unloading of line Boxes of Loco pilots and guards. | Letter of Acceptance |
28 | Mechanical | WMT/16/Running Room/RGDA, Date: 24.03.2016 | Maintenance and providing service for 110 bedded running room at Rayagada and loading/unloading and carrying of line boxes of Loco pilots and guards. | Letter of Acceptance |
29 | Mechanical | eT-SrDME-WAT-03-2016, Date: 20.10.2016 | Upper Gear passenger amenity attention works in railway coaches at Visakhapatnam coaching depot during primary and secondary maintenance of coaches for a period of 02(Two) years. | Letter of Acceptance |
30 | Mechanical | eT-SrDME-WAT-11-2016. | Outsourcing of welding works and Coal/Scrap lifting and it's disposal ar RYD depot of Visakhapatnam division for a period of 02 (Two) years. | Letter of Acceptance |
31 | MDTC | WAT/RSO/Tender/09-2017, Date: 28.07.2017. | House keeping of Multi-Disciplinary training Center and Hostel Building and 04 blocks of Railway Quarters at Marripalem, Visakhapatnam for a period of ONE year. | Letter of Acceptance |
32 | Medical | eT-CMS-WAT-BN1TN-01-2017 | Acceptance of offer for the work of "collection of 400 cft. of garbage per day from BN1TN colony, Malkonda Area colony, T.C.Palem colony and New colony under HI/BN1TN of Visakhapatnam and final disposal of the garbage to the nominated dumping ground of Greater Visakhapatnam Municipal Corporation (G.V.M.C) by engaging a Truck along with Driver, Fuel, Labour, equipments etc.., for a PERIOD OF TWO YEARS from the date of issue of LOA. | Letter of Acceptance |
33 | Medical | eT-CMS-WAT-Central-I-05-2017 | Acceptance of offer for the work of "collection of 400 cft. of garbage per day from Sevanagar colony, S&C colony, and Wireless colony under HI/Central-I of Visakhapatnam and final disposal of the garbage to the nominated dumping ground of Greater Visakhapatnam Municipal Corporation (G.V.M.C) by engaging a Truck along with Driver, Fuel, Labour, equipment etc.., for a PERIOD OF TWO YEARS from the date of issue of LOA. | Letter of Acceptance |
34 | Medical | eT-CMS-WAT-Central-II-06-2017 | Acceptance of offer for the work of "collection of 300 cft. of garbage per day from Gurkhaline colony, RV platform and MSM colony, under HI/Central-II of Visakhapatnam and final disposal of the garbage to the nominated dumping ground of Greater Visakhapatnam Municipal Corporation (G.V.M.C) by engaging a Truck along with Driver, Fuel, Labour, equipment etc.., for a PERIOD OF TWO YEARS from the date of issue of LOA. | Letter of Acceptance |
35 | Medical | eT-CMS-WAT-Jail Area-04-2017 | Acceptance of offer for the work of "collection of 400 cft. of garbage per day from Jail Area Colony, Harbour colony, Divl. Railway Hospital, DRM office complex under HI/Jail Area of Visakhapatnam and final disposal of the garbage to the nominated dumping ground of Greater Visakhapatnam Municipal Corporation (G.V.M.C) by engaging a Truck along with Driver, Fuel, Labour, equipment etc.., for a PERIOD OF TWO YEARS from the date of issue of LOA. | Letter of Acceptance |
36 | Medical | eT-CMS-WAT-CHE-STN-10-2017 | Acceptance of offer for the work of " Mechanized and Manual cleaning of SRIKAKULAM ROAD Railway Station, i.e surface cleaning activities from platform No.1 to 4, PRS complex, all the offices and service buildings, circulating area, concourse, Dormitories and waiting halls, RPF office, FOBs tracks, cleaning of drains, rag picking from all tracks from outer signal to outer signal by using Machines, consumables, tools & plant and Daily Garbage disposal from the station premises by using Truck, (as specified in the tender schedule) for a PERIOD OF THREE YEARS from the date of issue of LOA." | Letter of Acceptance |
37 | Medical | eT-CMS-WAT-VZM-STN-09-2017. | Acceptance of offer for the work of " Mechanized and Manual cleaning of Vizianagaram Railway Station", i.e surface cleaning activities from platform No.1 to 5, PRS complex, all the offices and service buildings, circulating area, concourse, Dormitories and waiting halls, RRI cabin, FOBs tracks, and Washable aprons, cleaning of drains, rag picking from all tracks from outer to outer signal by using Machines, consumables, tools & plant and Daily Garbage disposal from the station premises by using Truck, (as specified in the tender schedule) for a PERIOD OF THREE YEARS from the date of issue of LOA." | Letter of Acceptance |
38 | Medical | eT-CMS-WAT-MPM-07-2017. | Acceptance of offer for the work of " Collection of 400 cft., of garbage per day from NORTH MPM colony and south MPM colony under HI/MPM of Visakhapatnam and final disposal of the garbage to the nominated dumping ground of Greater Visakhapatnam Municipal Corporation (G.V.M.C) by engaging a Truck along with Driver, Fuel, Labour, equipment etc., for a PERIOD OF TWO YEARS from the date of issue of LOA". | Letter of Acceptance |
39 | Medical | WHH/33/RGDA Colony/160, Dt: 26.10.2015 | Acceptance of offer for the work "Contract for collection of 530 cft., of garbage per day from various Railway colonies of Rayagada, i.e, Traffic colony, Engineering Colony & Construction colony and final disposal to the nominated dumping ground of Rayagada Municipality , by Engineering a Mechanized carrier along with Driver, labour, Fuel & Equipments, etc. required for the same, for a PERIOD OF TWO YEARS from the date of issue of LOA." | Letter of Acceptance |
40 | Medical | eT-CMSWAT-RGDASTN-11-2017. | Acceptance of offer for the work of " Mechanized and Manual cleaning of RAYAGADA Railway Station", i.e surface cleaning activities from platform No.1 to 3, PRS complex, all the offices and service buildings, circulating and parking areas, concourse, Dormitories and waiting halls, FOBs tracks, and Washable aprons, cleaning of drains, rag picking from all tracks from outer to outer signal by using Machines, consumables, tools & plant and Daily Garbage disposal from the station premises by using Truck, (as specified in the tender schedule) for a PERIOD OF THREE YEARS from the date of issue of LOA." | Letter of Acceptance |
41 | Medical | eT-CMS-WAT-SCMN_EPRH-02-2017 | Acceptance of offer for the work of " Sweeping, cleaning the entire colonies of SCMN & EPRH colonies under HI/MPM of Visakhapatnam and final disposal of the garbage to the nominated dumping ground of Greater Visakhapatnam Municipal Corporation (G.V.M.C) by engaging a Truck along with Driver, Fuel, Labour, equipment etc., for a PERIOD OF TWO YEARS from the date of issue of LOA". | Letter of Acceptance |
42 | Medical | eT-CMS-WAT-VDPD-03-2017 | Acceptance of offer for the work of " collection of 100 cft. of garbage per day from VDPD Railway colony of Visakhapatnam and final disposal of the garbage to the nominated dumping ground of Greater Visakhapatnam Municipal Corporation (G.V.M.C) by engaging a Truck along with Driver, Fuel, Labour, equipment etc., for a PERIOD OF TWO YEARS from the date of issue of LOA". | Letter of Acceptance |
43 | Medical | WHS/24/MCC/VSKP RS/194, Dt: 27.01.2016 | Acceptance of offer for the work of "Integrated cleanliness contract (Mechanized) of Visakhapatnam Railway Station ,i.e, cleaning activities from platform Nos.1 to 9, Water pedestals, sitting pedestals, furniture, walls & Roofs, Top of shelters, lifts, Escalator, FOB's, Staircases, sanitary amenities and all the offices & service buildings on platform 1 & 8, Dormitories, Retiring rooms, and waiting halls, VIP Lounges and attached offices, PRS complex, Crew booking office, RRI cabin, TTE's restrooms, cash office and circulating and parking areas, Gardens, land 1cropings, concourse, cleaning of all tracks & washable track aprons. VIP siding & Parcel siding, drains, Rag picking from entire station and tracks up to home signal, Garbage collection and disposal to the GVMC nominated dumping ground, minor plumbing works in the entire station premises, pest and rodent control of entire station area by using mechanized equipments, consumables and tools (Annexure-C containing Schedule A to H showing description of work enclosed) for a period of 03 years from the date of issue of LOA. | Letter of Acceptance |
| | | | |
| | | | |
| | | | |