Circular No. | Subject | Date |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
174/2022 | Change in name of SILO Spur of Balaram Siding of M/s MCL as SILO Spur siding of M/s ACB (India) Ltd. | 19.05.2022 |
173/2022 | | |
172/2022 | Submission of multiple Letter of Credits(LCs) in case of 'Motor Vehicle' traffic pertaining to Bangladesh | 19.05.2022 |
|
171/2022 | Policy guidelines -Transportation products-Two point rake(other than covered wagons) POL traffic | 19.05.2022 |
170/2022 | | |
169/2022 | Commercial notification of 14th rake of BOXNHL 25T wagons of M/s TM International Logistics Ltd under GPWIS | 13.05.2022 |
168/2022 | Change of commodity after registration of indent for wagons | 12.05.2022 |
167/2022 | E-Payment System | 12.05.2022 |
166/2022 | | |
165/2022 | Delegation of power for waiver of Demurage and wharfage to DFCCIL | 11.05.2022 |
164/2022 | | |
163/2022 | Traffic of Paradip East Quay Coal Terminal Pvt. Ltd. of M/s PPT | 09.05.2022 |
162/2022 | Notification of Private sidings over ECoR as 25 T Axle Load Route | 06.05.2022 |
161/2022 | | |
160/2022 | Clarification regarding exemption from GST for supply to SEZ | 05.05.2022 |
159/2022 | e-RD submission of Letter of Credit(LC) in case of goods traffic pertaining to Bangladesh | 05.05.2022 |
158/2022 | | |
157/2022 | Opening of Sidhpur (SID) Railway Station for Parcel Traffic (lnward & Outward)in Ahmedabad (ADI) division over Western Railway | 05.05.2022 |
156/2022 | | |
155/2022 | Notification of Alternate goods shed over ECoR | 04.05.2022 |
154/2022 | Operation of Merry-Go-Round (MGR) System by Railways | 02.05.2022 |
153/2022 | Haulage charges on Round trip basis for transportation of container traffic | 29.04.2022 |
152/2022 | Joint Procedure Order for accountal of Anciliary Charges paid through Online Payment System e-CR Note and e-GBS | 29.04.2022 |
151/2022 | Premium Indent | 29.04.2022 |
150/2022 | Wharfage Rule Methodology for counting number of rakes for the purpose of classification of Railway Premises. | 28.04.2022 |
149/2022 | Clarifications on advance booking of Parcel space. | 28.04.2022 |
148/2022 | Inclusion of authorized rail users at Green field PFT of Container Corporation of India Ltd(CCJS) | 27.04.2022 |
147/2022 | Not issued | |
146/2022 | Discount on haulage charge for movement of container traffic | 22.04.2022 |
145/2022 | Routes for running of 25 T axle load wagons - correction slip | 21.04.2022 |
144/2022 | Delegation of power for waiver of wharfage/ demurrage | 20.04.2022 |
143/2022 | Routes for running of 25 T axle load wagons | 20.04.2022 |
142/2022 | Transportation products- Block rake, Mini Rake, two point | 19.04.2022 |
141/2022 | Authorized rail users of PFT of M/s CONCOR (CCJS) | 19.04.2022 |
140/2022 | Modification in circuit of wagons of M/s TM International Ltd | 19.04.2022 |
139/2022 | Loading/unloading points for wagons of M/s TM International Ltd | 19.04.2022 |
138/2022 | Loading/unloading points for wagons of M/s TM International Ltd | 19.04.2022 |
137/2022 | Operation of CC+8+2T /CC+6+2T trains | 14.04.2022 |
136/2022 | WRF in case of wheat traffic | 14.04.2022 |
135/2022 | Notification of two originating terminals (Covered wagon) | 13.04.2022 |
134/2022 | PCC of various wagons | 12.04.2022 |
133/2022 | Transportation of Liquid Medical Oxygen (LMO) | 12.04.2022 |
132/2022 | Opening of Gomtinagar(GTNR) for parcel traffic | 12.04.2022 |
131/2022 | Tolerance limit for Thermocol box loaded with fish | 11.04.2022 |
130/2022 | Chargeable distance of DDIP | 11.04.2022 |
129/2022 | Opening of Hirakud station for coal & Iron ore traffic | 08.04.2022 |
128/2022 | Conversion of BOXNHL wagons of M/s Adani Ltd in to 25 T | 08.04.2022 |
127/2022 | Traffic for the Private siding of M/s Hirakud Industrial Works | 07.04.2022 |
126/2022 | Guidelines regarding Advance Stacking | 05.04.2022 |
125/2022 | Additional authorized user for 25T wagons of M/s Adani Ltd | 05.04.2022 |
124/2022 | Charging of JCB | 05.04.2022 |
123/2022 | Modification in circuit of wagons of M/s Adani Ltd under GPWIS | 04.04.2022 |
122/2022 | Corrigendum to Preferential Traffic Order GO No.96 | 04.04.2022 |
121/2022 | Preferential Traffic Order GO No.96 | 01.04.2022 |
120/2022 | Discount on base freight rate for indented Parcel train | 01.04.2022 |
119/2022 | Wharfage rule- revision in free time | 01.04.2022 |
118/2022 | Grant of freight subsidy in Kisan Rail | 01.04.2022 |
117/2022 | e-RD- Submission of Letter of credit (LC) in Bangladesh traffic | 31.03.2022 |
116/2022 | Rate of terminal charge to be collected by port trust Railways | 31.03.2022 |
115/2022 | Operation of containers by CTO in CRT | 31.03.2022 |
114/2022 | Traffic at DDIP | 31.03.2022 |
113/2022 | Wharfage rule- revision in free time | 31.03.2022 |
112/2022 | Opening of PLH station for parcel traffic | 31.03.2022 |
111/2022 | Automatic Freight rebate scheme in TEFD | 31.03.2022 |
110/2022 | Transportation products- standard rake- BAFRDR | 31.03.2022 |
109/2022 | Action plan for GST compliance | 31.03.2022 |
108/2022 | Turnover threshold for e-invoicing under GST | 31.03.2022 |
107/2022 | Free time for loading of bagged consignment in open wagons | 31.03.2022 |
106/2022 | Additional free time for cleaning of Tank wagons | 31.03.2022 |
105/2022 | Incentive scheme for Freight Forwarders | 31.03.2022 |
104/2022 | Free time for loading of rakes of coal & Iron ore | 31.03.2022 |
103/2022 | Traffic to private siding of M/s NMDC, Amagura | 30.03.2022 |
102/2022 | Amendment No.1 of wagon Leasing scheme | 29.03.2022 |
101/2022 | Modification in circuit of wagons of M/s TM International Ltd | 29.03.2022 |
100/2022 | Traffic to the PFT of M/s IREL | 29.03.2022 |
99/2022 | Change of circuit of wagons of M/s Rungta Mines Ltd | 28.03.2022 |
98/2022 | Routes of running of 25T axle load wagons | 25.03.2022 |
97/2022 | Revision in Rates of Punitive charges | 22.03.2022 |
96/2022 | Revision of miscellaneous charges | 17.03.2022 |
95/2022 | Conversion of BOXNHL wagons of M/s SMNirayat Ltd in to 25 T | 17.03.2022 |
94/2022 | Rail Green Point | 17.03.2022 |
93/2022 | Freight incentive scheme for loading bagged consignment | 17.03.2022 |
92/2022 | Modification in circuit of wagons of M/s TM International Ltd | 17.03.2022 |
91/2022 | Haulage charge for running of Double Stack Dwarf Container | 15.03.2022 |
90/2022 | Rationalization scheme | 15.03.2022 |
89/2022 | Gati Shakti Multi Modal cargo Terminal | 15.03.2022 |
88/2022 | Opening of BHC goods shed for inward "Sand' traffic | 11.03.2022 |
87/2022 | Eleven digit numbers of Privately owned wagons of M/s Hindalco | 10.03.2022 |
86/2022 | Rate of stabling charge | 09.03.2022 |
85/2022 | Premier Customer facility at Paradeep port Trust | 09.03.2022 |
84/2022 | Rationalization scheme | 08.03.2022 |
83/2022 | Conversion of wagons of M/s TM International Ltd into 25T | 08.03.2022 |
82/2022 | User of 1st rake of M/s Adani logistics Ltd under GPWIS | 08.03.2022 |
81/2022 | Gati Shakti Multi Modal cargo Terminal | 08.03.2022 |
80/2022 | Release of RMC rake in system | 08.03.2022 |
79/2022 | Transportation product- standard rake - BOST wagon | 08.03.2022 |
78/2022 | e-RD- submission of LC in case of Bangladesh traffic | 04.03.2022 |
77/2022 | Tare weighment of wagons after CC examination | 04.03.2022 |
76/2022 | Induction of 4th rakes of M/s kalinga metalics ltd under GPWIS | 02.03.2022 |
75/2022 | Rationalization scheme | 28.02.2022 |
74/2022 | Induction of 1st rake of M/s Adani logistics Ltd under GPWIS | 28.02.2022 |
73/2022 | PCC of BG Bogie containers flat wagon type BLCS | 25.02.2022 |
72/2022 | Haulage charge for movement of Cube containers | 28.02.2022 |
71/2022 | change in name of M/s Tata steel BSL Ltd to M/s Tata Steel ltd | 25.02.2022 |
70/2022 | Master Circular on Operating Diversion of Coal and associated Freight Realization/Refunds | 24.02.2022 |
69/2022 | Rebate in freight in privately owned wagons of M/s NALCO | 24.02.2022 |
68/2022 | Advance Booking of Parcel Space in 'SLRs' and 'Parcel Vans' | 23.02.2022 |
67/2022 | Conversion of wagons of M/s TM International Ltd into 25T | 23.02.2022 |
66/2022 | Haulage charge for movement of Bulk Cement in containers | 22.02.2022 |
65/2022 | chargeable distance for paradip east quay coal terminal | 21.02.2022 |
64/2022 | Induction of 3 rakes of M/s kalinga metalics ltd under GPWIS | 21.02.2022 |
63/2022 | Commissioning of Paradip east quay coal terminal | 20.02.2022 |
62/2022 | Notified Stations | 18.02.2022 |
61/2022 | Amendment to FM Circular No.25/2019 dtd.29.10.2019 - Ownership of wagons after tertiary lease period Under Own Your Wagon Scheme | 17.02.2022 |
60/2022 | Classification of Tender Coconut | 17.02.2022 |
59/2022 | Charging of "Truck Mixtures" | 17.02.2022 |
58/2022 | E-Payment system. | 16.02.2022 |
57/2022 | Closure of stations in Salem (SA) division over Southern Railway for Parcel traffic | 15.02.2022 |
56/2022 | Installation of road weighbridge at Goods shed | 15.02.2022 |
55/2022 | Inclusion of three terminals in Haridaspur- Paradeep BG section | 15.02.2022 |
54/2022 | Conversion of 65 BOXNHL wagons inducted under GPWIS | 15.02.2022 |
53/2022 | e-RD & eT-RR | 14.02.2022 |
52/2022 | Classification of "Polyhalitie(all types) | 14.02.2022 |
51/2022 | Running of freight trains in CC+8 routes | 11.02.2022 |
50/2022 | Permission for stacking/removal of parcels to be loaded into/ unloaded from 'indented Parcel Vans' and 'indented Parcel trains' | 11.02.2022 |
49/2022 | Permitted commodities in Pvt siding M/s Mideast Integrated .. Ltd | 11.02.2022 |
48/2022 | Opening of Rengali station for inward traffic of Iron ore & pellets | 10.02.2022 |
47/2022 | Congestion surcharge for Goods traffic in Ports | 10.02.2022 |
46/2022 | Traffic at pvt siding M/s NTPC super thermal power station | 09.02.2022 |
45/2022 | Notification of Pvt siding as 25T axle route | 09.02.2022 |
44/2022 | Induction of 5 BOXNHL rakes of M/s SMNirayat Ltd in GPWIS | 08.02.2022 |
43/2022 | Reviewing of working hours of parcel office | 08.02.2022 |
42/2022 | Conversion of wagons of M/s TM International Ltd into 25T | 08.02.2022 |
41/2022 | Modification in circuits of 25T rakes of M/s TM international Ltd | 05.02.2022 |
40/2022 | Modification in circuits of 25T rakes of M/s TM international Ltd | 04.02.2022 |
39/2022 | Conversion of wagons of M/s TM International Ltd into 25T | 04.02.2022 |
38/2022 | Rationalization scheme G.O No.01/14 Amendment No.22 | 03.02.2022 |
37/2022 | Induction of 3 BOXNHL rakes of M/s Kalinga Metalics in GPWIS | 03.02.2022 |
36/2022 | Conversion of wagons of M/s TM International Ltd into 25T | 02.02.2022 |
35/2022 | Authorised user in PFT M/s Aryan Ispat & Power Ltd | 02.02.2022 |
34/2022 | Haulage of newly manufactured BCACBM rakes | 02.02.2022 |
33/2022 | Additional circuits for rakes of M/s TM international logistics Ltd | 01.02.2022 |
32/2022 | Conversion of wagons of M/s Adani logistics Ltd into 25T | 31.01.2022 |
31/2022 | GPWIS-reg. | 24.01.2022 |
30/2022 | OD pairs for BFNHM rakes of M/s TM international under SFTO | 24.01.2022 |
29/2022 | OD pairs for BFNHM rakes of M/s TM international under SFTO | 24.01.2022 |
28/2022 | OD pairs for BFNHM rakes of M/s TM international under SFTO | 24.01.2022 |
27/2022 | Authorized user for PFT M/s Aryan Ispat & Power Ltd | 21.01.2022 |
26/2022 | Conversion of wagons of M/s TM international Ltd into 25T | 21.01.2022 |
25/2022 | Conversion of wagons of M/s TM international Ltd into 25T | 20.01.2022 |
24/2022 | Induction of 5 BOXNHL rakes of M/s SMNirayat Ltd under GPWIS | 20.01.2022 |
23/2022 | Revision of PCC of BCN wagons for loading of Wheat & Rice | 19.01.2022 |
22/2022 | AMENDMENT NO.3 TO LSFTO MASTER CIRCULAR-2020 | 19.01.2022 |
21/2022 | Induction of 5 rakes of M/s SM Nirayat Pvt ltd under GPWIS | 19.01.2022 |
20/2022 | Revision of PCC of BCN rakes for loading of Rice & wheat | 19.01.2022 |
19/2022 | Restriction of Parcel traffic in Delhi area for Republic day | 19.01.2022 |
18/2022 | Induction of 5 rakes of M/s SM Nirayat Pvt ltd under GPWIS | 18.01.2022 |
17/2022 | Issue of RR after weighment | 18.01.2022 |
16/2022 | Revision of PCC of BCN rakes for loading of Rice & wheat | 18.01.2022 |
15/2022 | e-RD - Dispensing with physical submission of Forwarding Note | 17.01.2022 |
14/2022 | Permission for weightometer/ pre-weigh bin in Private siding | 11.01.2022 |
13/2022 | Conversion of BOXNHL wagons inducted by M/s Adani Logistics Limited under GPWIS into BOXNHL 25T wagons | 11.01.2022 |
12/2022 | Inclusion of additional Authorized Users for 1st BOXNHL rakes of M/s Adani Logistics Limited inducted under GPWIS | 11.01.2022 |
11/2022 | Opening of Belosonda for inward& outward freight traffic of Coal | 11.01.2022 |
10/2022 | Demurrage/wharfage -power to enhance free time | 10.01.2022 |
09/2022 | Conversion of BOXNHL wagons of M/s T M International Logistics Ltd | 10.01.2022 |
08/2022 | Through Distance Charging for Pvt siding of M/s NTPC Super Thermal Power Station, Talcher, Kaniha and allotment of new Alpha and Numerical Code to NTPC Exchange Yard, Talcher | 07.01.2022 |
07/2022 | Freight rebate in Traditional Empty Flow Direction | 07.01.2022 |
06/2022 | Commissioning of deep Draught Iron Ore and Coal Berths of M/s PPT, Paradeep | 06.01.2022 |
05/2022 | Authorised users for 7th & 8th BOXNHL rakes of M/s Adani logistics Ltd under GPWIS | 06.01.2022 |
04/2022 | Authorised user in PFT M/s CONCOR (CCJS) | 06.01.2022 |
03/2022 | Authorised user in PFT M/s Aryan Ispat & Power Ltd | 06.01.2022 |
02/2022 | Induction of 01 spare wagon against 9th GPWIS rake of M/s Adani Logistics Ltd | 04.01.2022 |
01/2022 | Guidelines for installation of road weighbridges in Goods Shed | 04.01.2022 |