TI/IN/0001 | 0 | PSI, Control voltage | Instruction for Booster Transformer & return conductors in 25 KV AC traction system. |
TI/IN/0002 | 0 | Shunt capacitor | Guidelines for design of fixed compensation for improving power factor at 25 KV, 50 Hz Traction sub-station. |
TI/IN/0008 | 0 | Copper cross feeder | Instruction for use of cupper cross feeders at switching station. |
TI/IN/0009 | 0 | OHE, Spider | Instruction for splicing of 19/3.99 mm Aluminium conductor (spider). |
TI/IN/0011 | 0 | TSS | Guidelines operating procedures of TSS in Mumbai area. |
TI/IN/0012 | 0 | Insulators | Instruction for action to be taken for failure prone insulators, insulators suspected to be failure prone and those to retained in service. |
TI/IN/0013 | 0 | Composite insulators | Action to be taken by Divn/OHE depots for handling of composite insulators. |
TI/IN/0014 | 0 | Use of DRPC | Instructions for use of DRPC on Indian Railways. |
TI/IN/0015 | 0 | SS Rope lubrication | Application of lubrication on wire rope used with ATD. |
TI/IN/0016 | 0 | Transformer | Guidelines for parallel operation of traction transformer on IR. |
TI/IN/0017 | 0 | Protection on parallel operation of transformer | Guidelines on protection scheme with parallel operation of 2x21.6 MVA traction transformer. |
TI/IN/0018 | 0 | Panto flash over relay | Application of existing panto flash over relay at TSS for single line section on IR. |
TI/IN/0019 | 0 | Harmonics measurement | Instruction for load profile, current & voltage harmonics measurement & recording in 25 KV AC traction sub-station. |
TI/IN/0020 | 0 | Replacement of computers at RCC | Instruction for timely replacement & upgradation of computers at RCC of traction SCADA system on IR. |
TI/IN/0021 | 01/10 | Data transfer speed of SCADA | Instruction for increasing data transfer sped of the traction SCADA system on IR from 600/1200 bps to min. 9600 bps. |
TI/IN/0022 | 02/10 | Relay setting guide lines | Setting guidelines for traction transformer & 25 KV shunt capacitor bank protection relay developed as per RDSO specification no. TI/SPC/ PSI/ PROTCT/6070(09/08) for 25 KV AC TSS. |
TI/IN/0023 | 02/10 | Operating RTU for SCADA | Instructions for operating RTUs with power supply of 110 V DC (in place of 240 V AC) for existing traction SCADA system on IR. |
TI/IN/0024 | 06/10 | Feeder CB tripping for 25 KV Traction | Instruction for monitoring & analysis of Feeder Circuit Breaker Tripping for 25 KV AC Traction systems. |
TI/IN/0025 | 08/10 | SCADA | Technical Instructions for improving reliability of traction SCADA systems on IR. |
TI/IN/0026 | 09/10 | Relay setting guidelines | Protection scheme and relay setting guidelines for 25 KV AC traction sub-station provided with 30 MVA traction transformer. |
TI/IN/0027 | 10/10 | Numerical relay maintenance practice | Technical instructions on maintenance practices to be adopted for numerical type microprocessor based protection relay modules for 25 KV AC traction system on Indian Railways. |
TI/IN/P&S/0028 | 12/10 | Feeder circuit breaker | Implementation of feeder circuit breaker backup feature in different makes/types of feeder protection modules provided in C & R panels as per old RDSO Spec. No. ETI/PSI/65 (01/97). |
TI/IN/0029 | | Vectorial Delta-I | Technical instructions on important aspects of relay settings of Vectorial Delta-I relays as per RDSO Specification No. TI/SPC/PSI/PROTCT/1982. |
TI/IN/0030 | 05/11 | Lightning arresters | Technical instructions related to the installation and commissioning of the 42 KV metal oxide gapless lightning arresters provided on traction systems on Indian Railways. |
TI/IN/0031 | 04/13 | Setting up earthing station | Special maintenance instruction for setting up earthing station at switching posts (SSP & SP). |
TI/IN/0032 | Rev 1 | Setting up earthing station | Special maintenance instruction for setting up earthing station at switching posts (SSP & SP).
|