Indian Railway main logo
Search :
Increase Font size Normal Font Decrease Font size
Find us on Facebook   View Content in Hindi
National Emblem of India

About us

Passenger/Freight

Tenders

News & Recruitment

Public Information

For IR Personnel

Contact Us



 
Bookmark Mail this page Print this page
QUICK LINKS


 Sl No  Dept Name Notice No Name of Work Letter of Acceptance 
 01  SANDT 09/2015/VSKP/S&T, Date : 23-07-2015 Comprehensive Annual Maintenance Contract for 533 Nos. of PCs and 417 Nos. of Printers over Waltair Division of East Coast Railway for a period of 24 ( Twenty four ) months/2 ( Two ) years.   Letter of Acceptance
 02  SANDTAMC:QN:ECR:VSKP:066(13-14), Date: 24-02-2014. AMC for the IPS Systems of Statcon make installed at 66 stations of waltair Division of E.Co.Rly, for a period of Three(3) years. Letter of Acceptance
 03  SANDTBudget: e2E/2014-15/197, Date: 19-03-2014.
E2E/2014-15/197-N1, Date: 25-08-2014.
 AMC for the EI System of GE make installed at 3 stations viz. Darliput(DPC), Padua(PFU) and Bheja(BHJA) of WAT division for a period of 3 (Three) years. Letter of Acceptance
 04  SANDT e2E/2015-16/073, Date: 09-07-2015. AMC for the EI System of GE make installed at 2 stations viz. Boddavara (BDVR) & Jagadalpur(JDB) of WAT division for a period of 3 (Three) years. Letter of Acceptance
 05  SANDT S&T/Tender/2016/AMC/HBL/IPS, Date: 15-07-2016. Comprehensive Annual Maintenance Contract for 10 nos. of HBL make mini IPS of WAT division for a period of 03 (Three) years. Letter of Acceptance
 06  SANDT SANDT_AMC_IPS_AMARA RAJA, Date: 02-12-2016. The Comprehensive Annual maintenance Contract for 20 nos. of Amara Raja make IPS (Integrated power supply) System of waltair Division for period of 03 (Three) years which is a SMPS based power supply of different signaling equipments like relays, Block Instruments, Axle Counters, Operation of point and other control Circuits etc, as applicable. Letter of Acceptance
 07  SANDT AMC_PRS_UTS, Date: 09-08-2016. Comprehensive Annual maintenance of all system peripheral Equipments of the Passenger Reservation System (PRS) & Unreserved Ticketing System(UTS) at all stations/locations of Main Line, R.V.Line, K.K.Line & K.R.Line (Total 83 stations of UTS locations and 27 PRS locations) of Waltair Divn. The equipments include (a) Dumb Terminals along with keyboard.(b) Thin Client along with Terminal & Key Board (c) Report Printers (d) Terminal Servers (e) Ticket Printers (f) Chart Printers for 03 (Three) Years.  Letter of Acceptance
 08  SANDT SANDT_2017_CAMC_EI_MEDHA, Date:05-07-2017. Comprehensive Annual Maintenance Contract for Electronic Interlocking System of MEDHA make at 5 Stations (DIR,PBV,MKRD,JDB,KMEZ) of Wat Divn for 03 (Three) years. Letter of Acceptance
 09 SANDT EFF/15-16/CUS/OUT/DEC/81, Date:22-03-2016. Comprehensive Annual Maintenance Contract for Dataloggers of Waltair Divn. (113 No.s) for a period of 03 (Three) years. Letter of Acceptance
 10 SANDT SRAP/ECoR/AMC-3 Stns/01796, Date:27-03-2014, SRAPL/ECoR/AMC-3 Stns/01889; Date:04-06-2014 AMC for WESTRACE-VML-6 based EI Systems installed at 3 (Three)(KMX, DNV and SNM) Rly. Stations of Wat Division for a period of 3(Three) Years. Letter of Acceptance
 11 SANDT S&T/Tender/2015/AMC/EI-Ansaldo, Date: 09-04-2015. AMC for the Electronic Interlocking Systems manufactured by Ansaldo STS Transportation System India Pvt.Ltd. of 17 stations in WAT division for a period of 3(Three) Years. Letter of Acceptance
 12  SANDT 16/2011/VSKP/S&T, Date:05-09-2011. Provision of Electronic Coach Indication Boards at Koraput of Waltair Division(Supply, Installation, Testing, Commissioning & Annual Maintenance). Letter of Acceptance
 13 Commercial WCX/MEM/Outsourcing/Comm.Activities/2015, Date: 23-11-2015 Outsourcing of Auto Announcements system, face to face enquiry facilities & Operation of computerized CIBs, TIBs at VSKP, VZM, CHE, RGDA, DVD, KRPU, VBL & PVP Stations for a period of one year. Letter of Acceptance
 14 Electrical (TRS) WAT/TRS/Tender/2015-16/Shed cleaning, Date:24-09-2015. Cleaning works for Electric Loco Shed premises, Visakhapatnam for a period of Two(2) Years. Letter of Acceptance
 15 Electrical (TRS) WAT-TRS-OT-16-17-Welding,  Welding works of electric locos at ELS/VSKP for a period of 2 years. Letter of Acceptance
 16 Mechanical (Diesel) MEG:ECOR:VSKP:5052/16, Date:23.07.2016 Overhauling for actuator unit of Micro Controlled Based Governor of Medha make in Sch M-48 & M-96 fitted in Diesel Electrical Locomotives. Letter of Acceptance
 17 Mechanical WMT/16/C-Category & Panel Patching/VSKP, Dated: 01.03.2016. Repair of C-Category unloadable BOXN wagons at CSL Depot and Panel Patching Repairs at CSL, OEC and VSPS depots of VSKP Division for a period of 2(Two) years. Letter of Acceptance
 18 Mechanical eT-SrDME-WAT-15-2017. Outsourcing of coal lifting and housekeeping activities at Central Sick line depot (CSL depot) of VSKP Division for a period of 02 years. Letter of Acceptance
 19 Mechanical eT-SrDME-WAT-21-2017. Mechanized Cleaning and watering of coaches under CTS during halt at Rayagada station including platform returned trains for a period of 02 years. Letter of Acceptance
 20 Mechanical WMT/16/CTS/VSKP, Dated: 25.04.2016. Mechanized Cleaning and watering of coaches under CTS during halt at Visakhapatnam station including platform returned trains for a period of 02 years. Letter of Acceptance
 21 Mechanical eT-SrDME-WAT-14-2017, Date:07.04.2017 Housekeeping and Allied activities at OEC wagon depot (Ore Exchange Complex) of Visakhapatnam Division for a period of 2 (two) years. Letter of Acceptance
 22 Mechanical eT-SrDME-WAT-19-2017, Date: 11-07-2017 Housekeeping and Allied activities at VSPS depot (Visakhapatnam Steel Plant siding) of Visakhapatnam Division for a period of 2 ( Two ) Years Letter of Acceptance
 23 Mechanical eT-SrDME-WAT-22-2017. Date: 09.08.2017 Housekeeping of Visakhapatnam coaching depot premises of Visakhapatnam Division for a period of 02 years. Letter of Acceptance
 24 Mechanical WMT/15/mcc/vskp, Dt: 15.07.2015 Mechanized cleaning of coaches for primary trains(Group-A) at Visakhapatnam coaching depot for a period of 02(Two) years. Letter of Acceptance
 25 Mechanical WMT/15/MCC/VSKP, Date: 15.07.2015. Mechanized Cleaning of coaches for Primary Trains(Group-B) at Visakhapatnam coaching depot for a period of 02(Two) years. Letter of Acceptance
 26 Mechanical eT-SrDME-WAT-12-2016, Date: 03.03.2017 Provision of Onboard Housekeeping Services for Visakhapatnam based Primary Trains (Phase-II) for a period of 20 months. Letter of Acceptance
 27 Mechanical WMT/16/OBHS/Phase-III/VSKP, Date: 10.03.2016 Provision of Onboard Housekeeping Services for Visakhapatnam based Primary Trains(Phase-III) for a period of 03 years. Letter of Acceptance
 28 Mechanical eT-SrDME-WAT-10-2016, Date: 27.01.2017 Provision of Onboard Housekeeping Services for Visakhapatnam based Primary Trains(Phase-I) for a period of 01(One) year. Letter of Acceptance
 27 Mechanical WMT/16/Running Room/DMNJ , Date: 08.02.2016 Maintenance and providing service for 16 bedded running room at Damanjodi and loading/unloading of line Boxes of Loco pilots and guards. Letter of Acceptance
 28 Mechanical WMT/16/Running Room/RGDA, Date: 24.03.2016 Maintenance and providing service for 110 bedded running room at Rayagada and loading/unloading and carrying of line boxes of Loco pilots and guards. Letter of Acceptance
 29 Mechanical eT-SrDME-WAT-03-2016, Date: 20.10.2016 Upper Gear passenger amenity attention works in railway coaches at Visakhapatnam coaching depot during primary and secondary maintenance of coaches for a period of 02(Two) years. Letter of Acceptance
 30 Mechanical eT-SrDME-WAT-11-2016. Outsourcing of welding works and Coal/Scrap lifting and it's disposal ar RYD depot of Visakhapatnam division for a period of 02 (Two) years. Letter of Acceptance
 31 MDTC WAT/RSO/Tender/09-2017, Date: 28.07.2017. House keeping of Multi-Disciplinary training Center and Hostel Building and 04 blocks of Railway Quarters at Marripalem, Visakhapatnam for a period of ONE year. Letter of Acceptance
     
     
  




Source : East Coast Railway CMS Team Last Reviewed on: 22-11-2017  


  Admin Login | Site Map | Contact Us | RTI | Disclaimer | Terms & Conditions | Privacy Policy Valid CSS! Valid XHTML 1.0 Strict

© 2016  All Rights Reserved.

This is the Portal of Indian Railways, developed with an objective to enable a single window access to information and services being provided by the various Indian Railways entities. The content in this Portal is the result of a collaborative effort of various Indian Railways Entities and Departments Maintained by CRIS, Ministry of Railways, Government of India.